move

This project was based in Kent at Charles Darwin School.

In the summer of 2016, H&V undertook phase 1 of the heating upgrade at Charles Darwin School. Phase 1 comprised of half of the school’s heating being upgraded. This was completed in September 2016 and H&V were asked to carry out the second phase starting in the summer of 2017.

Phase 2 consisted of stripping out and removing the old heating system and replacing with new.
X
move

This project was based in London at BNP Paribas.

BNP Paribas’ head office in Marylebone, consists of 7 floors and is a 24/7 operating building.

This project involved upgrading the supplementary cooling system, comprising of a new chilled water circuit including pumps and ancillaries serving fan coil units located within the ceiling void throughout the first floor, discharging through existing linear slot diffusers. 

X
move


This project was based in London at Leybridge & Newstead Estate.

The project comprised of the phases upgrading of the existing buried cold water mains serving the 4 no. Tower blocks that make up the estate i.e. (Merridale Tower, Block 1 to 44, Block 45 to 88 and Block 89 to 132).
X
move

2016 PROJECTS

Below are a few projects we carried out in 2016. Please click on the project headings to view the descriptions of works
X
move
University of Surrey


Twyford Court is one of the University’s student accommodation locations spread over 9 blocks. Our project covered Blocks A-F.

The project included the complete refurbishment of 195 student bedrooms and ensuites together with the replacement of 24 communal kitchens and general refurbishment to all communal corridors and staircases cores.

X
move


This project was based in London at London School of Economics Rosebery Hall Student Residents.

Rosebery Hall is an occupied premise for higher education with offices and bedrooms being continuously used 24 hours a day within two separate buildings. Rosebery Building and Myddleton Building.

The works consisted of the heating plant room replacements in Myddleton Building and Rosebery Building.
X
move


This project was based in London at The Charter School in Herne Hill.

The Charter School is a senior school housing 1500 students and teachers across 4 separate teaching blocks. It also has a sports block, which is used by both the school and also rented out during evenings, weekends and school holiday periods.

The works consisted of the partial upgrade of the heating plant and replacement of the district heating, hot water and cold-water pipework to the individual teaching blocks.