BlueGnome Laboratories

Pharmaceutical & Research

BlueGnome Laboratories

BlueGnome Laboratories

Laboratory Fit Out Mechanical & Electrical

This project consisted of the removal and fit-out of 3 new laboratory/ cleanroom facilities for Illumina.

Whilst the above works were carried out, the building was fully occupied and in operation throughout. Removal of the existing systems whilst maintaining plant operation serving other areas was a key risk associated with the works, as the facility is in 24/7 operation due to the nature of the research carried out.

Upon completion of the installation works, the systems were fully tested before being cleaned to required standards and finally fully commissioned and handed over.

The works were similar across the 3 packages and consisted of:

  • Removal of existing MEPH services and fabric back to the building structure
  • Supply and installation of new AHU and extract plant
  • Supply and installation of new humidification plant
  • Supply and installation of new chilled water plant
  • Supply and installation of new CHW fan coil units and close control units
  • Supply and installation of new VRF AC systems
  • Supply and installation of new power and lighting
  • Supply and installation of new ceilings and partitions
  • Major structural modifications
  • Installation of new laboratory benching
  • Installation of new glazed screens
  • Installation of new laboratory flooring
  • Installation of new distribution ductwork
  • Installation of new distribution pipework
  • Design and installation of new trend BMS control systems
  • Fire alarm works
  • UPS works
  • Pressure control between rooms
Client:
Illumina
Consultant:
Cambridge Van
Leyden
Value:
£959,906
Programme:
16 weeks